CRH Romcim, Romania

G Leonard • June 12, 2023

450 tonnes of material removed in 9 days - zero risk to operators

Compared to manually taking 14-16 days with the risk to operators

June 6, 2024
G Leonard North America INC has completed another Robotic Arm project with our North American partner K & G Industrial Services at Holly Hill (South Carolina) for Holcim US. Please reach out to them for services across North America by email, marty.sheffield@kandg.net eddie.basinger@kandg.net Their website is www.kandg.net
February 28, 2024
Congratulations to Holcim US INC. Devils Slide Plant and G Leonard North America INC. For partnering in the FIRST ever Robotic Arm Project in the United States of America This huge milestone shows the ultimate safety and efficiency benefits WE could provide at the same time for the Pyroclon Top Roof Demolition and C5 Refractory Panels Demolition shortly after Flame off
February 26, 2024
Raising the safety bar and setting the standards for all areas in the Pre Heater Tower #GLeonardRoboticArm
January 31, 2024
#G Leonard Robotic Arm
January 23, 2024
G Leonard’s Robotic Arm does not limit itself like others to one area - we are versatile to move through all areas efficiently within industrial plants to ensure that no area is left to the unnecessary risk or exposure to human operators going inside Available through UK/ Europe North America South East Asia
By G Leonard October 19, 2023
Pre-Inspections and Refractory Condition Inspected Carried out by G Leonard Robotic Arm Camera
More Posts
Share by: